QA Testing Checklists

PurposeRelease Readiness & Testing Gates
Last Updated2024-06-20

1. Smoke Testing Checklist

Purpose: Quick validation that core features work after deployment.

Duration: 30-45 minutes

Frequency: Every build deployment

Application Access & Login

  • Application homepage loads without errors
  • Login page displays correctly (all fields present)
  • Valid user can log in successfully
  • Invalid credentials show error message
  • Logout functionality works

Core User Workflows

  • User can create new project/workspace
  • User can view existing projects/workspaces
  • User can edit project settings
  • User can delete project (if permitted)
  • User can add team member to project

Database & API

  • API endpoints respond (check status codes)
  • Database queries execute without timeouts
  • Search functionality returns results
  • Data persistence: Create, Read, Update, Delete operations work

Performance & Stability

  • Application loads within acceptable time (<2s homepage)
  • No JavaScript console errors on key pages
  • No apparent memory leaks (browser dev tools)
  • Application remains responsive during basic usage

Sign-Off

  • ✓ Smoke test passed — application is usable
  • OR ✗ Smoke test failed — critical issue found; halt further testing

2. Regression Testing Checklist

Purpose: Ensure existing features continue to work after changes.

Duration: 2-4 days (depending on scope)

Frequency: Every sprint / major release

Authentication & Authorization

  • Login/logout workflow unchanged
  • Password reset flow works
  • Role-based permissions enforced
  • Session timeout occurs as expected
  • Multi-factor authentication (if enabled) functions

Core Features

  • Project/workspace creation & management
  • Document/file upload and download
  • Collaboration features (comments, sharing, permissions)
  • Search and filtering across data
  • Reporting and analytics dashboards

Data Integrity

  • No data loss on create/update/delete
  • Concurrent edits handled correctly
  • Undo/rollback features work as expected
  • Batch operations complete without errors

Cross-Browser & Cross-Device

  • Desktop: Chrome, Safari, Firefox, Edge — latest versions
  • Mobile: iOS Safari, Android Chrome
  • Responsive design works on all screen sizes
  • Touch interactions work on mobile/tablet

Integrations

  • Third-party integrations still functional
  • Webhooks deliver expected data
  • API endpoints backward compatible
  • Payment processing works (if applicable)

Sign-Off

  • ✓ Regression test suite: ≥95% pass rate
  • ✗ Critical issues found: Document and triage

3. Release Readiness Checklist

Purpose: Final gate before production deployment.

Duration: 3-5 days

Frequency: Before every production release

Functional Testing Complete

  • All new features tested and verified
  • All bug fixes validated and closed
  • No open P0 (critical) or P1 (high) bugs
  • P2 (medium) bugs documented and prioritized for next release

Performance & Scalability

  • Load testing completed at expected traffic levels
  • Database query performance optimized
  • API response times acceptable (<500ms for critical paths)
  • No memory leaks detected under sustained load

Security & Compliance

  • Security review completed by security team
  • No SQL injection, XSS, CSRF vulnerabilities found
  • Sensitive data encrypted in transit and at rest
  • Compliance checklist (GDPR, SOC2, etc.) passed
  • Penetration testing completed (if required)

Infrastructure & DevOps

  • Deployment scripts tested and verified
  • Database migrations validated in staging
  • Backup and recovery procedures tested
  • Rollback plan documented and rehearsed
  • Monitoring and alerting configured

Documentation & Communication

  • Release notes prepared and reviewed
  • API documentation updated (if changes)
  • User guides/help articles updated
  • Customer communication drafted (if breaking changes)
  • Internal team briefing scheduled

Sign-Offs Required

  • ✓ QA Lead: Testing complete, quality gates met
  • ✓ Dev Lead: Code review complete, deployment ready
  • ✓ Product Manager: Features meet requirements, ready for release
  • ✓ Security: No security vulnerabilities
  • ✓ Operations: Infrastructure ready, monitoring configured

4. Mobile-Specific Checklist

Platforms: iOS, Android

Functionality

  • App installs without errors
  • Core features work on both iOS and Android
  • Orientation changes (portrait ↔ landscape) handled
  • App backgrounding and resumption work correctly
  • Deep linking functions as expected

Permissions

  • Camera permission requests and handling
  • Location permission requests and handling
  • Photo library/gallery access permission
  • Contacts access permission (if applicable)
  • App works when permissions are denied

Push Notifications

  • Push notifications deliver on iOS
  • Push notifications deliver on Android
  • Tapping notification opens correct screen
  • Notification content displays correctly

Network Resilience

  • App handles WiFi disconnection gracefully
  • App handles cellular network switch
  • Offline mode displays appropriate message
  • Data syncs when connection restored

5. Accessibility Checklist

Standard: WCAG 2.1 AA

Screen Reader Support

  • All interactive elements accessible to VoiceOver (iOS) / TalkBack (Android)
  • Screen reader announces page titles and section headings
  • Links and buttons have descriptive labels
  • Form inputs have associated labels
  • Dynamic content updates announced

Keyboard Navigation

  • All functions accessible via keyboard
  • Tab order logical and intuitive
  • Focus indicator visible and clear
  • No keyboard traps

Color & Contrast

  • Text contrast ≥4.5:1 (normal) / ≥3:1 (large)
  • Color not sole means of conveying information
  • Interactive elements distinguishable

Text & Typography

  • Minimum text size 16px for body text
  • Text can be resized up to 200%
  • Line spacing ≥1.5
  • Text not justified (left-aligned preferred)
← Back to Checklists